Design and Front-End Engineering Modification to Nitrogen plant increasing capacity from 70 cu.m/hr to 115 cu.m/hr.
Design, construction, installation and commissioning of 2 MW waste to Energy plant.
Design of 3 x 70 TPH steam plants for FPSO.
Front End Engineering and Design (FEED) study for coastal CCUS plant.
Installation of artificial intelligence (AI) based on board governance and safety.
Design, Installation, and Commissioning of CCUS.
Installation and commissioning of AI-based behavioral safety monitoring system.
Complete retubing and design of boiler tubes.
Ubarana fixed platform, NC type 2 x 3900 kgh 7 bar WHRU.
Fixed Platform, NC type, 2 x 3900 kgh sat. steam 9 bar WHRU & 2 x 2500 kgh sat. steam 8 bar WHRU.
Suezmax Tanker – 145000 cu.m , Liverpool Bay, 2 x 10000 kgh 10 bar marine boilers.
Design, manufacture, and supply of Helical fin economizers & manufacture and supply of Spiral finned tubes.
Design/Commissioning of 1058 MW. Supplied replacement tube banks as part of the warranty agreement.